RAK Ceramics adopts LB technology for reusing production waste
LB is implementing a new body preparation plant at RAK Ceramics' facility in Ras Al Khaimah, UAE.
A new complete body preparation plant covering all stages from raw material reception to press loading is being built at the RAK Ceramics Group’s facility at Ras Al Khaimah (UAE).
The project was commissioned to LB, which studied the line in meticulous detail in order to meet the ceramic manufacturer’s requirements. In order to optimise costs, Rak Ceramics aims to reuse all production waste through a “closed circuit” recycling process. The most suitable solution was judged to be the proposal from LB, which has always been attentive to issues of savings, reuse and recycling.
Recent articles
Innovation in the field of modular logistics systems
May 18, 2022
Talleres Cortés celebrates 70 years of history
May 17, 2022
Ellek Automazioni exceeds pre-pandemic revenue
May 16, 2022
Ceramic World Review 146/2022
May 13, 2022